New Southbound Crossover Signal Tower         
Looks like there will be an overhead cantilever signal bridge here - present southbound signal out of SE Ocala siding in the background
Date: 5/27/2012 Location: Ocala, FL   Map Show Ocala on a rail map Views: 153 Collection Of:   Bob "RCA" Anderson
Author:  Bob
New Southbound Crossover Signal Tower
Picture Categories: Signal,Track This picture is part of album:  CSXT Wildwood Sub Ocala siding area track work
Share
User Comments
Name Type Comments Date
Bill Roland General Very interesting, I wondered what that was I saw down the tracks. Any idea on when they plan to start connecting Singletary and Ocala? 5/28/2012 5:38:17 PM
Bill Roland General Very interesting, I wondered what that was I saw down the tracks. Any idea on when they plan to start connecting Singletary and Ocala? 5/28/2012 5:39:21 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3043002